Operational Foundation
Licensed Production: Gold originates from a formally licensed mining PMPC Installed Capacity: Processing infrastructure supports annual throughput of approximately 161,000 troy ounces, providing a stable operational in PMPC. Controlled Conversion: Production is refined through international facilities under institutional standards. Documentation & Custody: Each stage benefits from formal export, refinery assay, and custody documentation. At current gold prices, this level of installed throughput represents an indicative gross value of approximately US$691 million, reinforcing the durability of the platform rather than short-term exposure to market cycles.
Operational Projection to 2030
By 2030, the operation is structured to reach approximately 238,000 troy ounces per year in annual processing capacity, without reliance on speculative plant expansion. Growth is driven by incremental efficiency gains, process optimization, and validated operational performance, preserving system control and regulatory integrity. At current gold prices, this projected level of throughput represents an indicative gross value in excess of US$1.0 billion annually, reinforcing the platform’s ability to support durable, long-term value creation anchored in physical capacity rather than market timing.
